Konstruktion · 25. Februar 2021
The assembly consisted of the following steps: Preparing the aluminium profile elements for assembly by drilling holes in every end and assembling the metal structure Attaching the aluminium LED plate to the roof of 3 shelves: drilling. Welding the aluminium tray into a waterproof reservoir Attaching the fitting and the pipe to the bottom of the tray Cutting and fitting the floor, ceiling, doors, backwall. On every step of the building process we encountered surprises and we had to adjust and...